1,800 Sq Ft Roof Tear-Off and Replacement Done in a Day

1,800 Sq Ft Roof Tear-Off and Replacement Done in a Day image
Gallery photos for 1,800 Sq Ft Roof Tear-Off and Replacement Done in a Day: Image #1Gallery photos for 1,800 Sq Ft Roof Tear-Off and Replacement Done in a Day: Image #2Gallery photos for 1,800 Sq Ft Roof Tear-Off and Replacement Done in a Day: Image #3Gallery photos for 1,800 Sq Ft Roof Tear-Off and Replacement Done in a Day: Image #4Gallery photos for 1,800 Sq Ft Roof Tear-Off and Replacement Done in a Day: Image #5Gallery photos for 1,800 Sq Ft Roof Tear-Off and Replacement Done in a Day: Image #6Gallery photos for 1,800 Sq Ft Roof Tear-Off and Replacement Done in a Day: Image #7Gallery photos for 1,800 Sq Ft Roof Tear-Off and Replacement Done in a Day: Image #8Gallery photos for 1,800 Sq Ft Roof Tear-Off and Replacement Done in a Day: Image #9Gallery photos for 1,800 Sq Ft Roof Tear-Off and Replacement Done in a Day: Image #10

A leaky roof is one of those problems that just wears on you. Every time it rains, you're scanning the ceiling, checking corners, hoping nothing new shows up. This homeowner had been dealing with exactly that - worn-out shingles that were past their limit and letting water in. They needed it done right, and they needed it done fast.

We started with a full tear-off. Every old shingle came off, down to the decking. That's the only way to know what you're actually working with underneath. Once the old material was stripped, we laid down fresh underlayment across the entire surface before a single new shingle went on. No shortcuts, no layering over the problem.

The whole job - tear-off, underlayment, and new shingles on 1,800 square feet - was wrapped up in a single day. That matters. The homeowner didn't have to worry about their house sitting exposed overnight or dragging the project out over multiple days. We showed up, got to work, and got it done.

The new dark charcoal shingles are laid out clean and tight from ridge to edge. Penetrations like the chimney and vent stacks were properly flashed and integrated into the new roof system - details that are easy to skip but make all the difference when the next heavy rain rolls through.

If your shingles are worn, curling, or you've already got water getting in, don't wait. These things don't fix themselves, and a small leak has a way of turning into a much bigger problem. Kastern Contracting handles full roof replacements like this one - straight talk, solid work, and a crew that actually shows up and finishes the job.